This first picture is of the soon to be upstairs laundry room. The plumber has been working on running the gas lines and all the plumbing.
This picture is standing in the shower and looking back towards the closet and vanity area....the vanity will be across from the fireplace. We will then have a dressing/sitting area in front of the bay windows.
This is looking in towards the closet. The vanity will go on the other side of the closet, across from the fireplace. We are also working on putting a gas insert into the fireplace and refacing it.
This is the bathroom floor with all the new plumbing and electrical. Wade and Jose spent a good part of Saturday installing the sub-floor which ended up taking a lot longer than anticipated as they worked around all the plumbing and old electrical conduit and made sure it was the right level and ready for the tile to be set.
This is the ceiling above bath area...you can see the duct work Wade was working on for 1 of the fans.
This is looking back towards the shower and toilet area
The new dumpster finally arrived today...just in time to start emptying out the master bedroom which was full of all the demo materials.
This shows the walls that Wade and Jose built on Sunday that frame in the toilet and then serve as the back of the shower.
Wade also spent a lot of time this past weekend working on the venting duct work for the master bath. He ran the ducts across the ceiling of the master bath and the through the adjacent small bedroom. The picture below is of the small bedroom's closet where the duct work then runs down to hook up with the venting out through the kitchen. We're hoping this will work so we don't have to put a new hole to the exterior on the 2nd floor.