Thursday, April 1, 2010

Finishing Touches Start

We're definitely getting closer as some more of the finishing touches get installed.  Vitaly came and installed the marble fireplace surround in the master bath...

as well as the matching vanity countertop...
We also replaced the old green tile surround in the dining room with a new granite surround/hearth...
The plumber has been busy installing shower fixtures...
and the new toilet...

Wednesday, March 31, 2010

Tile, Tile and More Tile!

Lots of tile work has been going on the past few weeks.  We are finally done tiling the master bath. 
We used carrera marble throughout the master bath...
This is the fireplace in the master bath where we used the same tile with the greek key pattern on the floor.  We will be putting in a marble surround that matches the marble vanity countertops.

This photo gives a better view of the shower...lots of subway tile!
Jason also tiled the fireplace in the master bedroom...this was the fireplace that had the fake granite surround.
\
Wade spent last weekend working on piecing together the trim for the doorway between the master bedroom and master bath...
We've also made good progress on the upstairs laundry room.  All the gas and water lines have been run and the venting is nearly complete.  Wade installed the cabinets and Jason finished tiling the platform for the washer/dryer.

Sunday, March 14, 2010

We're Getting Closer

Jason continues to make progress on the master bath tile...we're hoping to have the tile complete this week.
The tub surround is almost ready for the tub to be installed...plan is to install it next Saturday...
Here's a close up of the tub backsplash...Wade designed all the tile layout in the master bathroom.

We spent Friday night at Menards gathering supplies for the laundry room.  Wade made good progress getting the cabinets installed in the upstairs laundry room.  This is the room that is adjacent to the 2nd floor screened in porch..we're not sure what it was originally used for.
Among other things, Jose has removed the old green tile from the dining room fireplace in preparation for the new granite surround.  He also had to dig out the hearth, fill with sand and then put in cement board so we had a level area to lay the granite.

 
Some of our furniture that we ordered back in January is starting to arrive...another sign that we will hopefully be moving in soon. Here are the 2 chairs for the front living room which will go in front of the fire place.
A close up of the fabric on the chairs...
Wade is also anxiously awaiting the day he can enjoy his new theater room...he definitely has some comfy seating...

Wednesday, February 24, 2010

More Progress Upstairs

We continue to work hard on the upstairs.  This is the picture of the custom bathroom vanity in the master bath which sits across from the fireplace.  Bob (who made the kitchen cabinets) made this along with all the cabinetry in the master closet. 
Jason has been working all week on the tile in the master bath.  Wade worked hard on the design...we are using carrara marble throughout.  We also put in heated floors in the master bath.   This first picture shows the floor where we are using the greek key pattern on the perimeter. 
The next picture shows the shower floor which has a basketweave tile and then the carrara subway tile going up the sides.  He will be adding "picture frames" of the basketweave tile on the walls as well.
This is looking towards the tub deck where you can see the floor with the greek key pattern again....

The new jetted tub waits on the main staircase...
Jose has been busy sheetrocking...here he is working on the master bedroom. 

This is the new wall in the master bedroom...the entrance to the jack and jill bathroom used to be on the left and the closet used to be on the right...the closet is now accessed by the adjacent bedroom.
We continue to try and keep the downstairs clean since all the hardwood floors have been refinished.  This is standing in the dining room looking towards the living room...
This is the living room (with the leaning palm tree donated by Jose)...

Jason's first project was the kitchen backsplash which is carrara marble subway tile with a herringbone accent above the cooktop...
Down in the basement we have a new 75 gallon high efficiency water heater which will serve the whole house...
We also have a new sub panel to help accomodate all the new electrical...

Monday, February 1, 2010

Upstairs Progress

This past month we've been working on the upstairs master bath/closet and laundry room.  We are taking the bedroom next to the master and turning it into the master bath and closet.  This has involved a lot of plumbing and electrical work.  Similar to the kitchen, Wade has done all the design and planning work.

This first picture is of the soon to be upstairs laundry room.  The plumber has been working on running the gas lines and all the plumbing.
This picture is standing in the shower and looking back towards the closet and vanity area....the vanity will be across from the fireplace.  We will then have a dressing/sitting area in front of the bay windows.


This is looking in towards the closet.  The vanity will go on the other side of the closet, across from the fireplace.  We are also working on putting a gas insert into the fireplace and refacing it.
This is the bathroom floor with all the new plumbing and electrical.  Wade and Jose spent a good part of Saturday installing the sub-floor which ended up taking a lot longer than anticipated as they worked around all the plumbing and old electrical conduit and made sure it was the right level and ready for the tile to be set.
This is the ceiling above bath area...you can see the duct work Wade was working on for 1 of the fans. 
This is looking back towards the shower and toilet area

The new dumpster finally arrived today...just in time to start emptying out the master bedroom which was full of all the demo materials.
This shows the walls that Wade and Jose built on Sunday that frame in the toilet and then serve as the back of the shower.
Wade also spent a lot of time this past weekend working on the venting duct work for the master bath.  He ran the ducts across the ceiling of the master bath and the through the adjacent small bedroom.  The picture below is of the small bedroom's closet where the duct work then runs down to hook up with the venting out through the kitchen.  We're hoping this will work so we don't have to put a new hole to the exterior on the 2nd floor.

Saturday, December 26, 2009

Kitchen Floor Finished and New Colors for Living and Dining Room

This past week the floor in the kitchen was finished with 3 coats of poly and we painted most of the 1st floor
Finished Floor...

Eat in area...

All we have left is to do the backsplash and hang the lights over the islands...

Dining room with a new color...grayish/purple

After many different tries, we finally decided on "Restrained Gold" for the living room color.

Sunday, December 20, 2009

Kitchen is Almost Done!

This was another busy week in the kitchen.  The floors will get their poly tomorrow and then we will be almost done with the kitchen...the only things left will be to tile the backsplash and hang the lights over the islands.  We are very happy with the results...

Looking from pantry towards eat in...

Looking from eat in....

Wade installed the hood this weekend...


He also worked on creating the casing/molding around the pantry door and window next to the cooktop...